Amazing!

rj | Uncategorized | Saturday, March 15th, 2008

The shop has been cleared of equipment!

The Champion tire shrinker has been moved to storage, it was quite some production. The steel rack is also there. It fit. It all moved, it all fit, and we haven’t got more than a few square feet of unused space.

Moving it took 5 people,  an engine hoist, several chains, a dozen heavy planks, a trailer, and a lot of interesting verbiage.

Now we must remove the floorboards and crumbled stone within the next two weeks. I think it’s an approachable task.

To the gentleman who came by asking when we re-open, I’m sorry I couldn’t go into detail, but we were balancing a rather cumbersome contraption.  We hope to begin foreyard demos in April, and reopen the shop September or thereabouts, with allowances for building requirements.

Tomorrow I hope to stop by and remove some ivy from the back wall, and trench out the waterflow, which is a biennial job.

it’s been a while since the last post

rj | Uncategorized | Saturday, March 15th, 2008

work has been continuing, with flooring being removed, machinery going into storage, and some items being pulled for repair.

Rust mitigation is more of an issue with the complex machinery, but so far, we have been successful with all but one machine. It’s currently on an engine crane, and will be out tomorrow.

The Architects have been in, and we have instructions for site preparation.

We ought to know more in April.